Raipur STP 75, 35 & 90 MLD
• Project in brief – The Project for STP Raipur is based under the project of mission Clean Kharun River, an initiative by Raipur Municipal Corporation. The Funding for the project is under the Atal Mission for Rejuvenation and Urban Transformation (AMRUT) by the Chattisgarh Environment Conservation Board. Through this project, water from 7 nallas of the city will be trapped by KT weir at different locations and sewage water will be conveyed to telescopic RCC NP3 pipes interceptor sewer of Length 11420m (700mm to 1800mm Dia) and 350 mm DI pipe to 3 Sewage Treatment Plants of Capacity 75, 35 & 90 MLD each with SBR technology. The scope of work on these plants is EPC, testing, commissioning, trial run and 15 years of Operation & Maintenance.
5 MLD CETP, Butibori
PONDA ENVOCARE LIMITED
Durg Toll Plaza,NHAI Project,Durg By Pass,Durg Chhattisgarh
• Awarded in 2017
• Authority NHAI
• Project in brief Durg Toll Plaza at Durg Bypass on NH-6 This project is situated in state of Chhattisgarh
First BOT basis project of NHAI
Toll Operation Period of SMSIL – 30 years from 14th December 2000
Two additional toll point at Rasmara and Dhamdha entry point.
VIDYASAGAR SETU Toll Plaza, Kolkata
• Awarded in 2012
• Authority HRBC Kolkata
• Project in brief Fully modernised toll plaza
Total Number of Toll lanes – 20 (10 up and 10 down)
Six reversible lanes (3 up and 3 down)
Two ETC lanes or Tag lanes (1 up and 1 down)
Dharamtar Toll Plaza,Alibagh
• Awarded in 2015
• Authority MSRDC
• Project in brief Dharamtar Toll Plaza situated Near Pen, Raigarh, Maharashtra before 30 km. from Alibagh.
Toll plaza has 4 lanes. Two Lanes for Alibagh to Pen and Two lanes for Pen to Alibagh.
Electronically vehicle counting through Vehicle Counting Devices.