Battisa Nallah Gravity Dam across Battisa Nallah
Purna Barrage – 2 (Ner Dhamna)
Wardha Barrage (Hadgaon) Lift Irrigation Scheme
Lower Pedhi
Construction of H.R. at RD -119 to -49 m and Aqueduct
RD -49 To +780 m (khindsi)
Construction of Roadbed, Minor & Major bridges between km. 10.00 to Km. 45.00 in connection with New B.G electrified double line in the state of Chhattisgarh over South East Central Railway between Kharsia -Dharamjaygarh
• Awarded in 2015
• Authority – IRCON
• Project in brief – “Construction of roadbed, minor and major bridges km.10 to km.45 ln connection with new B.G. electrified line railway track in the state of Chhattisgarh over South East Central Railway between Kharsia-Dharamjaygarh.
Renigunta – Kadapa-Rayalacheruvu, SH-31
• Awarded in 2015
• Authority SKD GNSS Project Circle, KADAPA
• Project in brief – Formation of State Highway (Renigunta-Kadapa-Rayalacheruvu, SH-31) from Settivaripalli village to K.Sugumanchipalli village due to submergence of existing Road under Gandikota Reservoir in Kadapa District (Balance work).
Pench diversion Project
Durg Toll Plaza,NHAI Project,Durg By Pass,Durg Chhattisgarh
• Awarded in 2017
• Authority NHAI
• Project in brief Durg Toll Plaza at Durg Bypass on NH-6 This project is situated in state of Chhattisgarh
First BOT basis project of NHAI
Toll Operation Period of SMSIL – 30 years from 14th December 2000
Two additional toll point at Rasmara and Dhamdha entry point.